Vavuniya Surface Water Dam

  • Name: Surface Water Development in Vavuniya 

  • Client: National Water Supply & Drainage Board

  • Duration: 30 Months

  • Dam Length: 2.975Km

  • Dam Height: 10.5m

  • Dam Top Width: 5m

  • Net Catchment: 42 km²

  • Gross Catchment: 185 k

Aerial view

Dam Construction

Aerial view

Dam Construction

Vavniya Surface Water Dam