Ruhunupura Water Supply Project – 2
-
Pipe Laying:
-
UPVC (63-225mm): 336km
-
DI (250mm): 1.7 Km
-
Client: National Water Supply & Drainage Board (NWS&DB)
-
Banker: Commercial Bank of Ceylon
-
Duration: 9 Months
-
UPVC/DI: 250 Km