Murunkan to Mannar Water Supply Scheme
- Start Date: August 2011
- Client: National Water Supply and Drainage Board
- Duration: 18 Months
More Information
KDAW was honoured with an ICTAD National Construction Performance Award in 2013 for the construction of the Murunkan to Mannar water Supply Scheme. The Project consisted of laying 22Km of HDPE transmission line, including a 3.5Km DI lagoon Crossing.
KDAW has also substantially completed the phase 2 of the Mannar Water Supple Scheme which con- sists of 93km of UPVC and 58Km of HDPE lines for the distribution and transmission mains.
- HDPE : 22.8km
- Transmission DI Line : 3km (for a lagoon crossings)
- Major Bridge Crossing : 160m
- Major Marshy Land Crossing : 150m
Murunkan
Mannar
Kurundugahahetekma – End point of construction