Mallavi Water Supply

Supply & laying of UPVC transmission main and distribution system for Mallavi Water Supply Scheme

  • Name: Mallavi Water Supply
  • Contract Start: January 2012
  • Duration: 12 Months
  • Pipe laying: 
    • Transmission Main (UPVC) : 3.4km
    • Distribution (UPVC) : 33km
  • Employer: National Water Supply and Drainage Board

     

Mallavi Water Supply