Mallavi Water Supply
Supply & laying of UPVC transmission main and distribution system for Mallavi Water Supply Scheme
- Name: Mallavi Water Supply
- Contract Start: January 2012
- Duration: 12 Months
- Pipe laying:
- Transmission Main (UPVC) : 3.4km
- Distribution (UPVC) : 33km
- Employer: National Water Supply and Drainage Board