Dambulla Water Supply

  • Contract Start: Jan 2012
  • Duration: 18 Months
  • Pipe Laying Length: DI Line (Dia 900mm – 250mm) : 46 Km
  • UPVC : 7.95Km
  • RCC Ground Reservoirs

     Tittawelgolla RCC – 800m3

    Galewela RCC – 800m3

  • Employer: National Water Supply & Drainage Board

 

    Dambulla Water Supply