15 Bridges on Aluthgama – Southern Expressway Link Road

  • Client : Road Development Authority (RDA)
  • Duration : 24 months
  • Bridges:
    1. 43/5,6 (CH-43+155) – 2 Span (18m)
    2. 43/7 (CH-43+235) – 2 Span (11m)
    3. 44/3 (CH-43+938) – 1 Span (15m)
    4. 46/3 (CH-45+975) – 1 Span (13m)
    5. 44/1 (CH-43+328)
    6. 44/4 (CH-44+017)
    7. 44/5 (CH-44+055)
    8. 48/1 (CH-47+303)
    9. 48/2 (CH-47+695)
    10. 48/3 (CH-48+125)
    11. 49/5 (CH 49+095)
    12. 49/6 (CH 49+198)
    13. 50/1 (CH-49+325)
    14. 50/2 (CH-50+565)
    15. 53/2 (CH-52+370)